THIS IS MGOC WITH AN HFP UPDATE … Tuesday, June 29, 2010 AT 9 AM EDT
OPERATIONS
NOAA P-3s
NOAA-42: NOAA-42 returned from T.S. Alex last night early after shutting down an engine. Due to the length of time necessary for the repair, additional missions are cancelled until further notice from AOC.
NOAA 43: Unavailable.
G-IV
NOAA-49: Is tasked for a 0Z surveillance mission around T.S. Alex. Takeoff at 17:30 UTC, 1:30 PM EDT.
AFRC DRIFT BUOY DEPLOYMENT: No missions scheduled for next 24 h.
CONFERENCE CALL
A conference call is scheduled today, Tuesday, June 29, 2010, at 12:00 noon EDT to discuss future operations. This message will be updated when the aircraft status changes.
RAB
RAB/HAF/NMD
For the latest information about tropical cyclones and other weather systems, please visit the NOAA/NWS Tropical Prediction Center/National Hurricane Center’s web site at http://www.nhc.noaa.gov.
DISCLAIMER: The above discussion is intended to provide a brief summary of recent and future HRD Hurricane Field Program Operations. Any use of this material beyond its original intent is prohibited without permission of the HRD director. Media inquiries should be directed to Erica Rule (305-361-4541 or Erica.Rule, Evan Forde (305-361-4327 or Evan.Forde), or Jana Goldman (301-713-2483 or Jana.Goldman).