Mission science summar for September 20, 2010
IFEX
No activity planned in next 48 h.
GRIP
DC-8 is flying a mission into PGI46L/AL95 on Sept. 21. Takeoff from STX at 16Z, flying a square-spiral pattern. Return to STX. Another mission is planned for tomorrow, with a return to FLL.
GH is not flying, but is planning a test of the dropsonde system in the next 1-2 days.
WB-57 has no plans to fly in the next 24 h.
PREDICT
G-V is flying a mission into PGI46L/AL95 on Sept. 21, with a takeoff of 12Z. A square-spiral pattern is planned. Follow-on missions are anticipated into this system.
AIR FORCE
The Air Force has a low-level invest schedueld for September 22 into PGI46L/AL95.