OPERATIONS
NOAA P-3s
NOAA-42: All EMC-tasked TDR missions in TS Bonnie/TD#3 have been cancelled.
HRD and RSMAS scientists will be aboard an air-sea/in-storm mission on Saturday. The approximately 8-hour mission is scheduled to depart MacDill AFB at 2 PM EDT (1800 UTC).
NOAA 43: Unavailable.
G-IV
NOAA-49: Today’s scheduled NHC-tasked G-IV synoptic surveillance mission around TS Bonnie/TD #3 has been cancelled. No further NHC tasked missions in this system are planned.
AFRC DRIFT BUOY DEPLOYMENT: No missions scheduled for next 24 h.
CONFERENCE CALL
A conference call is scheduled tomorrow, Saturday, July 24, 2010 at 10:30 AM EDT (1430 UTC).
HAF
For the latest information about tropical cyclones and other weather systems, please visit the NOAA/NWS Tropical Prediction Center/National Hurricane Center’s web site at http://www.nhc.noaa.gov.
DISCLAIMER: The above discussion is intended to provide a brief summary of recent and future HRD Hurricane Field Program Operations. Any use of this material beyond its original intent is prohibited without permission of the HRD director. Media inquiries should be directed to Erica Rule (305-361-4541 or Erica.Rule, Evan Forde (305-361-4327 or Evan.Forde), or Jana Goldman (301-713-2483 or Jana.Goldman).