Figure 10

Fig. 10 Track forecasts for the no dropwindsonde GSM control (AVNO), the all dropwindsonde run (AVAL), the run with only targeted observations (AVTG), and that with the targeted observations and the observations in the storm circulation (AVT1) for Hurricane Bonnie, 24 August 1998 0000 UTC.