Mission Summary
20180920N1 Aircraft 49RF
SAL sampling

Aircraft Crew (49RF)
Aircraft CommanderDavid Cowan
Co-pilotTanner Sims
Flight DirectorRich Henning
System EngineerGabe Defeo
Dropsonde OperatorAkshar Patel
Dropsonde OperatorJames Warnecke

Scientific Crew (49RF)
LPSJon ZawislakHRD

Scientific Crew (Ground)
LPSJason DunionHRD


Proposed NOAA 49 track

Actual flight track

Mission Plan :

NOAA 49RF (N49) will fly a HRD/NESDIS-tasked sampling of multiple air masses with GPS dropsondes, including the Saharan Air Layer (SAL), mid-latitude dry air, and a tropical wave in the eastern Caribbean. Observations collected will be used for validation of NOAA satellite sounding retrievals as part of the NOAA Unique Combined Atmospheric Processing System(NUCAPS).

HURRICANE SYNOPTIC SURVEILLANCE MISSION PLAN: Misc
Hurricane Research Division
September 19, 2018 10:40 AM
Aircraft: N49RF
Proposed takeoff: 20/1300Z
DROP LOCATION TABLE
# LAT LON Time
deg min deg min hr:min
1 27 3078 12 0:30
2 27 0076 00 0:47
3I26 3074 38 0:58
4I26 0073 15 1:09
5I25 3071 53 1:20
6 25 0070 30 1:32
7 24 0068 00 1:53
8I23 3867 08 2:00
9I23 1566 15 2:08
10I22 5365 23 2:15
11I22 3064 30 2:22
12I22 0863 38 2:29
13I21 4562 45 2:37
14I21 2361 53 2:44
15 21 0061 00 2:52
16I20 1559 53 3:03
17I19 3058 45 3:13
18I18 4557 38 3:24
19 18 0056 30 3:36
20I17 0056 30 3:44
21I16 0056 30 3:52
22 15 0056 30 4:01
23I15 0057 36 4:10
24I15 0058 42 4:19
25I15 0059 48 4:27
26I15 0060 54 4:36
27 15 0062 00 4:46
28I15 0062 50 4:52
29I15 0063 40 4:59
30I15 0064 30 5:05
31I15 0065 20 5:12
32I15 0066 10 5:18
33 15 0067 00 5:26
34I15 0068 30 5:38
35 15 0070 00 5:51
36 16 0071 00 6:03
37 17 0072 06 6:16
38 22 0076 30 7:10
39 23 0077 30 7:22
40 25 0079 12 7:44

Mission Summary :

Take off Landing
Linder-Lakeland, FL 13:00UTC Linder-Lakeland, FL 21:30 UTC
42 dropsondes launched.

Problems :


Mission Data :


Flight track

Temperature and Moisture

Wind and Atlitude

Flight Director's log | Flight Director's manifest | NetCDF data | 1 second data
LPS log | Drop log


Page last updated May 31, 2019
Return to Mission page.