Aircraft Commander | |
Co-pilot | |
Flight Engineer | |
Flight Director | |
Flight Director | |
Dropsonde Operator | |
Dropsonde Operator | |
Dropsonde Operator | |
Dropsonde Operator |
Lead Project Scientist | Eric Uhlhorn |
Radar Scientist | Rob Rogers |
Dropsonde Scientist | Shirley Murillo |
Workstation Scientist | Paul Leighton |
Radar Scientist | John Gamache |
|
Mission Plan :
The P-3 is tasked by HRD to carry out a calibration mission over the Gulf of Mexico. The aircraft will depart MacDill AFB, FL 13:00 UTC and return to MacDill AFB, FL by 17:00 UTC.
Mission Summary :
The P-3 copleted its calibration mission over the Gulf of Mexico. The aircraft will depart MacDill AFB, FL ~16:00 UTC and return to MacDill AFB, FL by 20:30 UTC.
Problems :
Page last updated September 21, 2009
Return to Mission page.