Aircraft Commander | Pat Didier |
Co-pilot | John Rossi |
Co-pilot | Dean Legidakes |
Flight Engineer | Mike Sanchez |
Flight Engineer | Chris Lalonde |
Navigator | Pete Freeman |
Flight Director | Paul Flaherty |
Flight Director | Ashley Landry |
System Engineer | Todd Richards |
Data Technician | Dana Naeher |
AVAPS | Joe Greene |
Observer | Daemon San Souci |
LPS | Heather Holbach | HRD |
Dropsonde | Kelly Ryan | HRD |
Radar | J. Vilardell Sanchez | |
Observer | Zorana Jelenak | NESDIS |
Radar | John Gamache | HRD |
Figure 1. Flight plan for 20190927I1 mission for Lorenzo |
Figure 2. Actual flight track for 20190927I1 mission for Lorenzo |
Mission Plan :
NOAA43 will conduct an HRD-tasked SFMR Validation research mission with Ocean Winds experiment into Hurricane Lorenzo.
Mission Summary :
Take off | Landing
Barbados, BWI
| 12:13 UTC
| Barbados, BWI
| 22:26 UTC
| |
Mission was Aborted due to a Search and Rescue (SAR) request to help locate the supply vessel Burbon Rhode.
Prepared by the Hurricane Research Division Sept. 27, 2019 12:15 PM EDT Aircraft: N43RF Proposed takeoff: 27/1200Z | |||||||
DROP LOCATION TABLE | |||||||
# | LAT | LON | RAD/AZMON | Time | |||
deg min | deg min | deg nm | hr:min |
Mission Evaluation / Problems :
Flight track |
Temperature and Moisture |
Wind and Atlitude |