Aircraft Commander | Harris Halverson |
Co-pilot | Justin Kibbey |
Co-pilot | Mark Nelson |
Flight Engineer | Greg Bast |
Flight Engineer | Joe Klippel |
Navigator | Ryan Kidder |
Flight Director | Ian Sears |
Flight Director | Paul Flaherty |
Data Technician | Joe Bosko |
Data Technician | Terry Lynch |
Dropsonde Operator | Bill Olney |
Mechanic | Wes Crouch |
Electronics Technician | James Warnecke |
Lead Scientist | Frank Marks |
Radar Scientist | Sylvie Lorsolo |
Dropsonde Scientist | Bachire Annane |
SFMR Scientist | Ivan Popstefanija (ProSensing) |
SFMR Scientist | Nick Slavich (ProSensing) |
|
Mission Plan :
NOAA 42RF will fly a Genesis mission in Tropical Disturbance 92 in the Caribbean Sea. The P-3 will leave MacDill AFB, FL at 0800 UTC and will recover in St Croix, USVI by 1600 UTC.
Mission Summary :
Take off | Landing
MacDill AFB, FL
| 13/09:14 UTC
| St. Croix, USVI
| 13/17:17 UTC
| |
NOAA 42RF flew a Genesis mission in Tropical Disturbance 92 in the Caribbean Sea. The P-3 left MacDill AFB, FL at ~0910 UTC and recovered in St Croix, USVI by 1718 UTC.
Problems :
![]() Flight track |
![]() Temperature and Moisture |
![]() Wind and Atlitude |
LPS forms |
Radar forms |
Dropsonde forms |
1 second data |
NetCDF data