Aircraft Commander | Al Girimonte |
Co-pilot | |
Flight Engineer | |
Flight Engineer | |
Navigator | Joe Bishop |
Flight Director | Barry Damiano |
Flight Director | |
Data Technician | Dana Naeher |
Engineer | |
Engineer | |
Electronics Technician | Damon San Souci |
Dropsonde Operator | Bobby Peek |
Dropsonde Operator | Charles Lynch |
Lead Scientist | Rob Rogers |
Radar Scientist | Shirley Murillo |
SFMR Scientist | Brad Klotz |
|
Mission Plan :
NOAA 43RF will fly a Genesis mission in Tropical Disturbance 92 in the central Caribbean Sea. The P-3 will leave MacDill AFB, FL at 2000 UTC and will recover at St. Croix, USVI by 0400 UTC the next day.
Mission Summary :
Take off | Landing
MacDill AFB, FL | 12/: 20:00UTC
| St. Croix, USVI | 13/04:00 UTC
| |
Problems :
![]() Flight track |
![]() Temperature and Moisture |
![]() Wind and Atlitude |
Serial data | 1 second data | NetCDF