| Aircraft Commander |
| Co-pilot |
| Co-pilot |
| Flight Engineer |
| Navigator |
| Flight Director |
| System Engineer |
| Data Technician |
| LPS | HRD |
| Dropsonde | HRD |
| Radar | HRD |
| Observer | NESDIS |
| Observer | NESDIS |
| Radar | John Gamache | HRD |
Figure 1. Flight plan for 20190920I1 mission for Jerry |
Mission Plan :
NOAA43 will conduct an HRD-tasked AIPEX/TC in Shear research mission into Hurricane Jerry.
Mission Summary :
| Take off | Landing
| Linder-Lakeland, FL
| 13:12 UTC
| Linder-Lakeland, FL
| 15:21 UTC
| | ||
Flight was aborted during ferry due to mechanical problems.
|
Prepared by the Hurricane Research Division Aug. 30, 2019 12:15 PM EDT Aircraft: N43RF Proposed takeoff: 20/1300Z | |||||||
| DROP LOCATION TABLE | |||||||
| # | LAT | LON | RAD/AZMON | Time | |||
| deg min | deg min | deg nm | hr:min | ||||
| 1S | 20 30 | 60 00 | 105/360 | 3:56 | |||
| 2S | 17 00 | 60 00 | 105/180 | 4:49 | |||
| 3S | 18 45 | 58 09 | 105/090 | 5:27 | |||
| 4S | 18 45 | 61 51 | 105/270 | 6:20 | |||
Mission Evaluation / Problems :