Aircraft Commander |
Co-pilot |
Co-pilot |
Co-pilot |
Flight Engineer |
Flight Engineer |
Flight Engineer |
Flight Engineer |
Navigator |
Navigator |
Flight Director |
Flight Director |
System Engineer |
Data Technician |
Data Technician |
Dropsonde Operator |
Dropsonde Operator |
Mechanic |
Mechanic |
Original Proposed NOAA 49 track |
Actual Synoptic Surveillance NOAA 49 track |
Mission Plan :
NOAA 49RF (N49) will fly a synoptic surveillance mission around Hurricane Irma.
Prepared by the National Hurricane Center September 07, 2017 7:33:37 PM Aircraft: N49RF Proposed takeoff: 09/0530Z | |||||||
DROP LOCATION TABLE | |||||||
# | LAT | LON | Time | ||||
deg min | deg min | hr:min | |||||
1 | 26 01 | -79 04 | 0:34 | ||||
2 | 27 30 | -79 00 | 0:46 | ||||
3 | 29 30 | -79 00 | 1:02 | ||||
4 | 31 30 | -79 00 | 1:18 | ||||
5 | 31 30 | -77 00 | 1:34 | ||||
6 | 31 30 | -75 00 | 1:49 | ||||
7 | 31 30 | -73 00 | 2:04 | ||||
8 | 29 30 | -73 00 | 2:20 | ||||
9 | 29 30 | -75 00 | 2:35 | ||||
10 | 29 30 | -77 00 | 2:51 | ||||
11 | 27 30 | -77 00 | 3:07 | ||||
12 | 27 30 | -75 00 | 3:22 | ||||
13 | 25 30 | -77 30 | 3:48 | ||||
14 | 24 24 | -75 42 | 4:04 | ||||
15 | 23 06 | -75 24 | 4:15 | ||||
16 | 21 48 | -75 42 | 4:26 | ||||
17 | 20 00 | -74 00 | 4:46 | ||||
18 | 19 30 | -76 00 | 5:03 | ||||
19 | 20 01 | -78 00 | 5:19 | ||||
20 | 20 11 | -79 04 | 5:28 | ||||
21 | 20 45 | -80 16 | 5:38 | ||||
22 | 21 48 | -81 06 | 5:49 | ||||
23 | 21 00 | -83 00 | 6:05 | ||||
24 | 22 00 | -85 30 | 6:27 | ||||
25 | 24 00 | -86 30 | 6:45 | ||||
26 | 24 00 | -84 00 | 7:04 | ||||
27 | 26 00 | -84 00 | 7:21 | ||||
28 | 26 00 | -86 00 | 7:36 | ||||
29 | 28 00 | -86 00 | 7:53 | ||||
30 | 29 00 | -84 00 | 8:10 |
Mission Summary :
Take off | Landing
Linder-Lakeland, FL
| 05:30 UTC
| Linder-Lakeland, FL
| 13:30 UTC
| |
Problems :
Flight track |
Temperature and Moisture |
Wind and Atlitude |
Flight Director's manifest | NetCDF data | serial data | One second data