Doppler/Dropsonde Scientist | Paul Leighton |
Doppler/Dropsonde Scientist | Eric Uhlhorn |
Pilots | Carl Newman |
Flight Director | Tom Shepherd |
Navigator | Tim Gallagher |
Flt. Eng. | Steve Wade |
Data Tech | Sean McMillan John Hill |
Elec. Tech | Bill Olney |
Mission Plan :
N42RF will fly an EMC-tasked 3D Doppler winds mission into Ingrid. It will leave Barbados at 04:00 AM AST, and recover at Barbados by 1:00 PM AST.
Mission summary:
Mission Data:
![]() Flight track |
![]() Temperature and Moisture |
![]() Wind |
![]() Flight track |