Lead Project Scientist | Eric Uhlhorn |
AXBT Scientist | Ben Jaimes de la Cruz (UMiami) |
AXBT Scientist | Jodi Brewster (UMiami) |
AXBT Scientist | Patrick Meyers (UMiami) |
Pilots | M. Nelson A. Ebhardt |
Flight Director | Jack Parrish |
Navigator | T. Gallagher |
Flt. Eng. | |
Data Tech | T. Lynch J. Smith |
Elec. Tech | S. Naeher D. SansSouci |
Mission Plan :
N43RF will fly an AXBT deployment mission over the loop current in front of Hurricane Ike. It will leave MacDill AFB, FL at 16:00 UTC and arrive back at MacDill, FL at 22:00 UTC. The flight is at 8000' unpressurized.
Mission Summary :
Take off | Landing
MacDill AFB, FL | 15:36 UTC
| MacDill AFB, FL | 22:11 UTC
| |
The mission was flown according to plan. AXBTs were dropped every 1/2° longitude/latitude. A slight deviation for convection occurred at 24°N 90°W. All AXBTs were channel 12 transmitters. A total of 47 AXBT were deployed, of which 45 returned temperature profiles.
Problems :
None. Very successful mission. Plane landed safely. Went to happy hour immediately afterward. Saw Sam the Bartender.
EWU
23 April 2009
Mission Data
Flight Data | ||
Flight track |
Temperature and Moisture |
Wind and Atlitude |