| Aircraft Commander | Barry Choy |
| Co-pilot | Mark Nelson |
| Co-pilot | Cathy Martin |
| Flight Engineer | Paul Darby |
| Flight Engineer | Joe Klippel |
| Navigator | Tim Gallagher |
| Navigator | Chris Sloan |
| Flight Director | Jack Parrish |
| Flight Director | Richard Henning |
| Lead El Tech | Dana Naeher |
| El Tech | Joe Bosko |
| Lead Project Scientist | Joe Cione |
| Dropsonde Scientist | Jun Zhang |
| Radar Scientist | John Gamache |
| Observer | Thomas Philip (USheffield) |
Mission Plan :
N42RF is scheduled for a TDR mission into Tropical Storm Ida, with takeoff on Sunday, Nov. 8 at 20:00 Z from MacDill AFB, FL and return to MacDill AFB, FL on Monday, Nov. 9 at 05:00 Z.
Mission Summary :
| Take off | Landing
| MacDill AFB, FL | 19:55 UTC
| MacDill AFB, FL | ??:?? UTC
| | ||
Problems :
Due to mechanical troubles this flight was aborted and further TDR missions into Ida were cancelled.
![]() Flight track |
![]() Temperature and Moisture |
![]() Wind and Atlitude |
Page last updated Feb. 18, 2010
Return to Mission page.