| Aircraft Commander | Kristie Twining |
| Co-pilot | Rebecca Waddington |
| Co-pilot | Brad Fritzler |
| Flight Director | Ian Sears |
| Flight Director | Paul Flaherty |
| System Engineer | Michael McAlister |
| Data Technician | Gabe Defeo |
| Data Technician | Underwood |
| Dropsonde Operator | Charles Lynch |
| Crew Chief | Angel Negron |
| None |
| Radar | HRD |
![]() Final flight track |
Mission Plan :
NOAA 49RF (N49) will ferry to Hawaii to conduct a series of NHC-tasked Synoptic surveillance missions around Hurricane Hector.
Mission Summary :
| Take off | Landing
| Linder-Lakeland, FL
| 17:29 UTC
| Long Beach, CA
| 22:03 UTC
| | ||
Problems :
![]() Flight track |
![]() Temperature and Moisture |
![]() Wind and Atlitude |
Flight Director's log |
Flight Director's manifest |
NetCDF data |
serial data |
1 second data