Aircraft Commander | Kristie Twining |
Co-pilot | Fritzler |
Co-pilot | Tanner Sims |
Flight Director | Rich Henning |
Flight Director | Paul Flaherty |
System Engineer | Jim Roles |
Data Technician | Miller |
Dropsonde Operator | Jeff Smith |
Dropsonde Operator | Underwood |
Proposed NOAA 49 track |
Actual NOAA 49 track |
Mission Plan :
NOAA 49RF will conduct NHC-tasked Synoptic Surveillance mission on Tropical Storm Harvey in the Gulf of Mexico.
Prepared by the National Hurricane Center August 22, 2017 6:32:07 PM Aircraft: N49RF Proposed takeoff: 24/0530Z | |||||||
DROP LOCATION TABLE | |||||||
# | LAT | LON | Time | ||||
deg min | deg min | hr:min | |||||
1 | 26 00 | -84 00 | 0:23 | ||||
2 | 24 30 | -83 30 | 0:35 | ||||
3 | 24 00 | -85 00 | 0:48 | ||||
4 | 24 00 | -86 30 | 0:60 | ||||
5 | 24 00 | -88 00 | 1:11 | ||||
6 | 24 00 | -89 30 | 1:23 | ||||
7 | 25 30 | -90 00 | 1:36 | ||||
8 | 25 06 | -91 24 | 1:47 | ||||
9 | 23 48 | -91 06 | 1:58 | ||||
10 | 22 30 | -91 24 | 2:09 | ||||
11 | 21 27 | -92 14 | 2:20 | ||||
12 | 20 53 | -93 26 | 2:30 | ||||
13 | 20 53 | -94 46 | 2:41 | ||||
14 | 21 27 | -95 58 | 2:52 | ||||
15 | 22 30 | -96 48 | 3:02 | ||||
16 | 23 48 | -97 06 | 3:13 | ||||
17 | 26 09 | -95 58 | 3:34 | ||||
18 | 26 43 | -94 46 | 3:45 | ||||
19 | 28 00 | -95 00 | 3:55 | ||||
20 | 28 00 | -93 00 | 4:11 | ||||
21 | 26 43 | -93 26 | 4:22 | ||||
22 | 26 09 | -92 14 | 4:32 | ||||
23 | 28 00 | -91 00 | 4:50 | ||||
24 | 27 00 | -89 30 | 5:04 | ||||
25 | 26 00 | -88 30 | 5:16 | ||||
26 | 26 00 | -87 00 | 5:27 | ||||
27 | 29 00 | -88 00 | 5:53 | ||||
28 | 27 30 | -86 30 | 6:10 | ||||
29 | 27 30 | -85 00 | 6:21 | ||||
30 | 28 30 | -84 00 | 6:32 |
Take off | Landing
Lakeland-Linder, FL
| 05:44 UTC
| Lakeland-Linder, FL
| 12:29 UTC
| |
30 dropsondes deployed, 29 good and 29 sent, 1 bad.
Problems :
Return to Mission page.