Mission Summary
20060829H1 Aircraft 42RF
Ernesto flight 2006

Scientific Crew (42RF)
Radar ScientistPaul Leighton

Mission Plan :

NOAA 42, with Paul Leighton aboard will fly a SFMR NHC-tasked mission into Tropical Storm Ernesto. The P3 will leave MacDill AFB, FL at 6:00 AM EDT and will recover at MacDill AFB, FL by 3:30 PM EDT. A 3-D Doppler winds flight pattern, in support of NCEP/EMC, will also be flown during the mission.

Mission Summary :

NOAA 42, with Paul Leighton aboard flew a SFMR NHC-tasked mission into Tropical Storm Ernesto. The P3 left MacDill AFB, FL at 6:00 AM EDT and recovered at MacDill AFB, FL at 3:30 PM EDT. A 3-D Doppler winds flight pattern, in support of NCEP/EMC, was also flown during the mission.

Problems :


Mission Data

NetCDF file | One second listing | Ten second listing

Flight Data


Flight track

Temperature and Moisture

Wind and Atlitude

Flight track detail

Flight track detail

Flight track detail
 
Flight track detail
 


Page last updated August 30, 2006
Return to Mission page.