Aircraft Commander |
Co-pilot |
Co-pilot |
Flight Director |
Flight Director |
Electronic Technician |
Electronic Technician |
Electronic Technician |
Data Engineer |
Remote Dropsonde Scientist | Kathryn Sellwood (HRD) |
Mission Plan :
NOAA 49RF will fly a HRD-tasked Model Evaluation missions around Edouard. The G-IV will leave Bermuda at 1300 UTC on September 16th and will recover at Bermuda 1930 UTC the same day.
Proposed track (earth relative) |
Proposed track (storm relative) |
Prepared by the Hurricane Research Division September 14, 2014 02:50 PM Aircraft: N49RF Proposed takeoff: 16/1300Z
DROP LOCATIONS
| #
| LAT
| LON
| RAD/AZM
| TIME
|
| deg min
| deg min
| nm/dg
| hr:mn
| 2 | 33 24 | 60 51 | 216/300 | 0:30
| 3 | 32 56 | 58 03 | 90/330 | 0:50
| 4 | 35 17 | 57 10 | 216/360 | 1:11
| 5 | 33 03 | 56 17 | 90/030 | 1:31
| 6 | 33 38 | 53 29 | 216/060 | 1:52
| 7 | 31 52 | 55 23 | 90/090 | 2:13
| 8 | 30 07 | 53 31 | 216/120 | 2:33
| 9 | 30 40 | 56 15 | 90/150 | 2:54
| 10 | 28 26 | 57 06 | 216/180 | 3:14
| 11 | 30 47 | 57 58 | 90/210 | 3:35
| 12 | 30 20 | 60 42 | 216/240 | 3:56
| 13 | 32 12 | 58 50 | 90/270 | 4:17
| 14 | 33 32 | 57 56 | 90/330 | 4:30
| 15 | 33 34 | 56 12 | 90/030 | 4:43
| 16 | 32 18 | 55 18 | 90/090 | 4:56
| 17 | 31 03 | 56 11 | 90/150 | 5:09
| 18 | 31 05 | 57 55 | 90/210 | 5:22
| 19 | 32 25 | 58 48 | 90/270 | 5:36
| 20 | 34 18 | 60 42 | 216/300 | 5:57
| |
Mission cancelled due to mechanical problems
Problems :
Page last updated September 16, 2014
Return to Mission page.