Aircraft Commander | Mark Sweeney |
Co-pilot | Chris Kerns |
Co-pilot | Pat Didier |
Navigator | Tim Gallagher |
Flight Engineer | Joe Heystek |
Flight Engineer | Chris Lalonde |
Flight Director | Jack Parrish |
Flight Director | Mike Holmes |
System Engineer | Dana Naeher |
Data Technician | Terry Lynch |
AVAPS | Damon San Souci |
LPS | Eric Uhlhorn (HRD) |
AXBT | Benjamin Jaimes (RSMAS) |
IWRAP | Sulieman Alweiss (NESDIS) |
IWRAP | Joe Sapp (NESDIS) |
Mission Plan :
NOAA43 will conduct both an HRD-tasked Ocean Survey mission into Tropical Storm Edouard. Takeoff is scheduled for 1400 UTC from St. Croix, USVI and recover there at 2300 UTC.
Mission Summary :
Take off | Landing
St. Croix, USVI | 13:57 UTC
| St. Croix, USVI | 21:21 UTC
| |
Mission Evaluation:
Problems:
Mission Data :
Flight track |
Temperature and Moisture |
Wind and Atlitude |