| Aircraft Commander | Mark Sweeney |
| Co-pilot | Chris Kerns |
| Co-pilot | Pat Didier |
| Navigator | Tim Gallagher |
| Flight Engineer | Joe Heystek |
| Flight Engineer | Chris Lalonde |
| Flight Director | Jack Parrish |
| Flight Director | Mike Holmes |
| System Engineer | Dana Naeher |
| Data Technician | Terry Lynch |
| AVAPS | Damon San Souci |
| LPS | Eric Uhlhorn (HRD) |
| AXBT | Benjamin Jaimes (RSMAS) |
| IWRAP | Sulieman Alweiss (NESDIS) |
| IWRAP | Joe Sapp (NESDIS) |
Mission Plan :
NOAA43 will conduct both an HRD-tasked Ocean Survey mission into Tropical Storm Edouard. Takeoff is scheduled for 1400 UTC from St. Croix, USVI and recover there at 2300 UTC.
Mission Summary :
| Take off | Landing
| St. Croix, USVI | 13:57 UTC
| St. Croix, USVI | 21:21 UTC
| | ||
Mission Evaluation:
Problems:
Mission Data :
![]() Flight track |
![]() Temperature and Moisture |
![]() Wind and Atlitude |