DEPARTMENT OF THE AIR FORCE Air Force Reserve Command MEMORANDUM FOR ARWO Scheduler 03 Sep 19 FROM: 53 WRS Flight Meteorologist SUBJECT: Mission Summary Report G E N E R A L I N F O R M A T I O N ---------------------------------------------------------------------------- | Mission Type | Hurricane | | Tasking | 0230, 0530, 0830z Fix | | Mission ID | 5308 3505A DORIAN | | Departure Base/Time | bix 09/03/19 00:00 | | Arrival Base/Time | bix 09/03/19 05:42 | | Flight Time | 5.7 hours | ---------------------------------------------------------------------------- F I X P O I N T S ---------------------------------------------------------------------------- | | Latitude | Longitude | SLP | MWnd | SWS | | | Date/Time | dd mm N/S | ddd mm E/W | mb | kt | kt | Hurricane | |----------------------------------------------------------------------------| | 09/03/19 02:26 | 26 51 N | 078 23 W | 949 | 93 | 87 | X | | 09/03/19 03:24 | 26 50 N | 078 24 W | 950 | 102 | 86 | X | ---------------------------------------------------------------------------- C R E W R O S T E R ---------------------------------------------------------------------------- |AC | Wagner | |CP | Williams, Bolton | |Nav | Mitchell | |ARWO | Gautrau | |LM | Latham | |OTHER| | ---------------------------------------------------------------------------- REMARKS: maintenance issues required us to return to keesler early. plan is to swap aircraft and come back out for the 0830z fix time. two total fixes on the hurricane Penetrations Logged: 2 ARWO:____________________________________ Penetrations Verified: Verifier:____________________________________ Penetrations Posted: Awards:____________________________________