Aircraft Commander | Harris Halverson |
Co-pilot | Chris Kerns |
Co-pilot | Mark Nelson |
Flight Engineer | Joe Klippel |
Flight Engineer | Paul Darby |
Navigator | Ryan Kidder |
Flight Director | Ian Sears |
Flight Director | Jack Parrish |
Project Manager | Paul Flaherty |
Data Technician | Joe Bosko |
Electronics Technician | Bill Olney |
Electronics Technician | Todd Richards |
Mechanic | Lonnie Kregelka |
Lead Scientist | Mike Black (HRD) |
Workstation | Paul Leighton (HRD) |
Observer | Pete Curran (FEMA) |
Observer | Diana Goeller (NHC) |
|
Mission Plan :
NOAA 43RF will ferry to San Diego, CA for a series of Decay missions into Hurricane Dora in the eastern Pacific. The P-3 will leave MacDill AFB, FL 1600 UTC and will land at San Diego NAS, CA (KNZY) by 2300 UTC.
Mission Summary :
Take off | Landing
MacDill AFB, FL | 21/16:33 UTC
| San Diego NAS, CA | 21/22:50 UTC
| |
NOAA 43RF ferried to San Diego, CA for a series of Decay missions into Hurricane Dora in the eastern Pacific. The P-3 left MacDill AFB, FL 1635 UTC and landed at San Diego NAS, CA (KNZY) at 2301 UTC.
Problems :
Track |
Temperature and Moisture |
Wind and Atlitude |