Mission Summary
20080720N1 Aircraft 49RF
Dolly flight 2008

Aircraft Crew (49RF)
Aircraft CommanderMichele Finn
PilotsJohn Longenecker
Will Odell
Flight DirectorPaul Flaherty
DropsondeMarty Mayeaux
AVAPSMark Rogers
Data SystemAl Goldstein
Leonard Miller
Jamal West

Mission Plan :

The G-IV jet, with no HRD scientific crew will fly a Synoptic Surveillance mission around Tropical Storm Dolly. The jet will leave MacDill AFB, FL at 17:30 UTC and will recover at MacDill AFB, FL by 02:00 UTC.

Synoptic Surveillance MISSION PLAN
INVEST (DOLLY)

July 20, 2008 8:52:00 AM
Aircraft: N49RF
Proposed takeoff: 20/0930Z
DROP
#
LAT
(d m)
LON
(d m)
TIME
(h:mm)
12400-85000:37
22130-85300:58
32100-83001:18
42059-81001:34
51800-80001:59
61700-81002:11
71630-83302:31
81605-87403:05
91606-86203:15
101639-85083:26
111742-84183:37
121900-84003:48
132018-84183:59
142155-87404:29
152300-90004:49
162200-91005:00
172100-92005:12
182000-93005:23
191900-94005:34
202100-94005:51
212200-93006:02
222300-92006:13
232500-93006:32
242500-91006:47
252630-90007:02
262500-89007:16
272630-88007:31
282500-87007:45

Mission Summary :

The G-IV jet, with no HRD scientific crew flew a Synoptic Surveillance mission around Tropical Storm Dolly. The jet left MacDill AFB, FL at 17:25 UTC and recovered at MacDill AFB, FL by 01:56 UTC.

Problems :


Mission Data :

Pressure height maps of dropsonde data
100mb map
200mb map
250mb map
300mb map
400mb map
500mb map
700mb map
850mb map
925mb map
1000mb map
surface map


Page last updated July 29, 2008
Return to Mission page.