Mission Summary
20160606N1 Aircraft 49RF
Tropical Storm Colin in Shear

Aircraft Crew (49RF)
Aircraft CommanderJason Mansour
Co-pilotBrad Fritzler
Flight DirectorIan Sears
Flight DirectorJack Parrish
Data TechnicianHartberger
Data TechnicianSteve Paul
Dropsonde OperatorBobby Peek
Dropsonde OperatorGabe DeFeo
Scientific Crew (49RF)
None


Proposed NOAA 49 track

Final NOAA 49 track

Mission Plan :

NOAA 49RF will conduct HRD-tasked TC in Shear experiment on Tropical Storm Colin in the Gulf of Mexico.

TDR MISSION PLAN: Danny
Prepared by the Hurricane Research Division
August 20, 2015
Aircraft: N49RF
Proposed takeoff: 06/0600Z
DROP LOCATION TABLE
# LAT LON RAD/AZM Time
deg min deg min n mi/deg hr:min
2S27 4487 26 150/0000:37
3S26 3287 24 75/0000:48
4S24 0787 22 75/1801:09
5S22 5587 20 150/1801:20
6S25 3290 02 150/2701:50
7S25 3588 38 75/2702:01
8S25 4085 50 75/0902:23
9S25 4284 26 150/0902:34
10S24 0185 13 150/1352:50
11S24 5686 10 75/1353:02
12S26 4788 04 75/3153:23
13S27 4389 01 150/3153:34
14S27 5085 03 150/0454:04
15S26 5986 01 75/0454:15
16S25 1887 55 75/2254:35
17S24 2888 52 150/2254:46
18S26 1889 39 150/2705:03
19S26 2884 03 150/0905:45
20S24 0586 45 150/1806:14
21S29 1586 40 150/0006:57
Mission Summary :

Take off Landing
MacDill AFB, FL 06:30 UTC MacDill AFB, FL 13:43 UTC

Problems :


Mission Data :

Flight Director's log | Flight Director's manifest | NetCDF data | 1 second data | serial data


Page last updated Feb. 23, 2017
Return to Mission page.