Aircraft Commander | |
Co-pilot | |
Flight Engineer | |
Flight Director | |
Flight Director | |
Dropsonde Operator | |
Dropsonde Operator | |
Dropsonde Operator | |
Dropsonde Operator |
Lead Project Scientist | Mike Black |
Cloud Physics Scientist | Bob Black |
Radar Scientist | Bachir Annane |
![]() |
Mission Plan :
The P-3 is tasked by HRD to carry out a SALEX mission into Tropical Depression #2 east of Barbados. The aircraft will depart Barbados 20:00 UTC and arrive in Barbados by 04:30 UTC.
Mission Summary :
Problems :
Flight cancelled due to fuel line leak.
Page last updated August 14, 2009
Return to Mission page.