| Aircraft Commander |
| Co-pilot |
| Navigator |
| Flight Engineer |
| Flight Director |
| Data Technician |
| AVAPS |
| Electronics Technician |
| LPS | Rob Rogers |
| Drops | Sim Aberson |
| Radar | Shirley Murillo |
| Radar | Andy Hazelton |
Mission Plan :

NOAA 42RF will carry out a Genesis/ TDR missions into Tropical Disturbance AL92. The P-3 will leave MacDill AFB, FL 0600 UTC and will recover at MacDill AFB, FL by 0100 UTC the same day.
Mission Summary :
Mission cancelled due to forecast track of AL92
Problems :
Mission Data :