DEPARTMENT OF THE AIR FORCE Air Force Reserve Command MEMORANDUM FOR ARWO Scheduler 17 Jun 2013 FROM: 53 WRS Flight Meteorologist SUBJECT: Mission Summary Report G E N E R A L I N F O R M A T I O N ---------------------------------------------------------------------------- | Mission Type | Tropical Storm | | Tasking | 17/20Z INVEST | | Mission ID | 5306 02BBA INVEST | | Departure Base/Time | KBIX 06/06/13 Cancelled | | Arrival Base/Time | KBIX 06/06/13 Cancelled | | Flight Time | 0.0 hours | ---------------------------------------------------------------------------- F I X P O I N T S ---------------------------------------------------------------------------- | | Latitude | Longitude | SLP | MWnd | SWS | | | Date/Time | dd mm N/S | ddd mm E/W | mb | kt | kt | Hurricane | |----------------------------------------------------------------------------| | | | | ---------------------------------------------------------------------------- C R E W R O S T E R ---------------------------------------------------------------------------- |AC | WAGNER | |CP | MCLUEN | |Nav | WALTER | |ARWO | BRADY | |LM | BARNABY | |OTHER| | ---------------------------------------------------------------------------- REMARKS: 1100 AM EDT SUN 16 JUNE 2013 SUBJECT: TROPICAL CYCLONE PLAN OF THE DAY (TCPOD) VALID 17/1100Z TO 18/1100Z JUNE 2013 TCPOD NUMBER.....13-016 I. ATLANTIC REQUIREMENTS 1. SUSPECT AREA FLIGHT ONE -- TEAL 70 A. 17/2000Z B. AFXXX 01BBA INVEST C. 17/1700Z D. 17.0N 87.0W E. 17/1930-2330Z F. SFC TO 10,000 FT ***INVEST IN THE BAY OF HONDURAS FOR 17/2000Z CANCELED BY NHC AT 17/1230Z. CREW ABOVE ENDED UP FLYING 2.6 LOCAL WEATHER LINE INSTEAD*** JWB Penetrations Logged: 0 ARWO:____________________________________ Penetrations Verified: Verifier:____________________________________ Penetrations Posted: Awards:____________________________________