DEPARTMENT OF THE AIR FORCE Air Force Reserve Command MEMORANDUM FOR ARWO Scheduler 20 Nov 01 FROM: 53 WRS Flight Meteorologist SUBJECT: Mission Summary Report G E N E R A L I N F O R M A T I O N ---------------------------------------------------------------------------- | Mission Type | Tropical Storm | | Tasking | 1205A ELSA | | Mission ID | 5301 1205A ELSA | | Departure Base/Time | KBIX 07/06/2021 22:56 | | Arrival Base/Time | KBIX | | Flight Time | X.X | ---------------------------------------------------------------------------- F I X P O I N T S ---------------------------------------------------------------------------- | | Latitude | Longitude | SLP | MWnd | SWS | | | Date/Time | dd mm N/S | ddd mm E/W | mb | kt | kt | Hurricane | |----------------------------------------------------------------------------| ---------------------------------------------------------------------------- C R E W R O S T E R ---------------------------------------------------------------------------- |AC | Tift | |CP | Heintz | |Nav | Dobson | |ARWO | Carpenter | |LM | Banks | |OTHER| | ---------------------------------------------------------------------------- REMARKS: This is part one of a two part fix mission into Elsa. The mission had to be restarted (as a new mission) due to a) an incorrect date/time retrieved from the EGI, reflected on all obs and messages, and b) multiple crashes of the ARWO computer. I'm not sure if any of this data is usable. No fixes were made due to the center still being on the Cuban coast. We ultimately landed early at 0432Z and the total time was 5.6. Penetrations Logged: 0 ARWO:____________________________________ Penetrations Verified: Verifier:____________________________________ Penetrations Posted: Awards:____________________________________ DEPARTMENT OF THE AIR FORCE Air Force Reserve Command MEMORANDUM FOR ARWO Scheduler 20 Nov 01 FROM: 53 WRS Flight Meteorologist SUBJECT: Mission Summary Report G E N E R A L I N F O R M A T I O N ---------------------------------------------------------------------------- | Mission Type | Tropical Storm | | Tasking | 1205A ELSA1 | | Mission ID | 5301 1205A ELSA1 | | Departure Base/Time | KBIX 07/05/21 22:56 | | Arrival Base/Time | KBIX | | Flight Time | X.X | ---------------------------------------------------------------------------- F I X P O I N T S ---------------------------------------------------------------------------- | | Latitude | Longitude | SLP | MWnd | SWS | | | Date/Time | dd mm N/S | ddd mm E/W | mb | kt | kt | Hurricane | |----------------------------------------------------------------------------| ---------------------------------------------------------------------------- C R E W R O S T E R ---------------------------------------------------------------------------- |AC | Tift | |CP | Heintz | |Nav | Dobson | |ARWO | Carpenter | |LM | Banks | |OTHER| | ---------------------------------------------------------------------------- REMARKS: This is part two of a two part fix mission into Elsa. The mission had to be restarted (as a new mission) due to a) an incorrect date/time retrieved from the EGI, reflected on all obs and messages, and b) multiple crashes of the ARWO computer. I'm not sure if any of this data is usable. No fixes were made due to the center still being on the Cuban coast. We ultimately landed early at 0432Z and the total time was 5.6. Penetrations Logged: 0 ARWO:____________________________________ Penetrations Verified: Verifier:____________________________________ Penetrations Posted: Awards:____________________________________