DEPARTMENT OF THE AIR FORCE Air Force Reserve Command MEMORANDUM FOR ARWO Scheduler 28 Aug 16 FROM: 53 WRS Flight Meteorologist SUBJECT: Mission Summary Report G E N E R A L I N F O R M A T I O N ---------------------------------------------------------------------------- | Mission Type | Tropical Depression | | Tasking | 18z Fix on TD #8 | | Mission ID | 5303 0108A CYCLONE | | Departure Base/Time | bix 08/28/16 14:24 | | Arrival Base/Time | bix 08/28/16 23:00 | | Flight Time | 8.6 hours | ---------------------------------------------------------------------------- F I X P O I N T S ---------------------------------------------------------------------------- | | Latitude | Longitude | SLP | MWnd | SWS | | | Date/Time | dd mm N/S | ddd mm E/W | mb | kt | kt | Hurricane | |----------------------------------------------------------------------------| | 08/28/16 18:09 | 31 38 N | 070 41 W | 1010 | 30 | 35 | | | 08/28/16 18:09 | 31 38 N | 070 41 W | 1010 | 30 | 35 | | | 08/28/16 18:59 | 31 34 N | 070 49 W | 1010 | 20 | 24 | | | 08/28/16 18:59 | 31 34 N | 070 49 W | 1010 | 20 | 24 | | | 08/28/16 19:35 | 31 40 N | 070 55 W | 1010 | 27 | 27 | | | 08/28/16 19:35 | 31 40 N | 070 55 W | 1010 | 27 | 27 | | ---------------------------------------------------------------------------- C R E W R O S T E R ---------------------------------------------------------------------------- |AC | Garcia | |CP | Gibson, AllenC | |Nav | Dobson | |ARWO | Gautrau | |LM | Latham, Daniel, Banks | |OTHER| | ---------------------------------------------------------------------------- REMARKS: Original tasking was for a 18z Invest. Upon taking off, the mission was switched to a Fix mission on a Cyclone. One alpha pattern was requested, then changed to 3 total fixes. Penetrations Logged: 0 ARWO:____________________________________ Penetrations Verified: Verifier:____________________________________ Penetrations Posted: Awards:____________________________________