DEPARTMENT OF THE AIR FORCE Air Force Reserve Command MEMORANDUM FOR ARWO Scheduler 22 Nov 16 FROM: 53 WRS Flight Meteorologist SUBJECT: Mission Summary Report G E N E R A L I N F O R M A T I O N ---------------------------------------------------------------------------- | Mission Type | Tropical Storm | | Tasking | 0216A OTTO | | Mission ID | 5301 0216A OTTO | | Departure Base/Time | KBIX 11/22/16 06:26 | | Arrival Base/Time | KBIX 11/22/16 17:19 :19 | | Flight Time | 10.9 hours | ---------------------------------------------------------------------------- F I X P O I N T S ---------------------------------------------------------------------------- | | Latitude | Longitude | SLP | MWnd | SWS | | | Date/Time | dd mm N/S | ddd mm E/W | mb | kt | kt | Hurricane | |----------------------------------------------------------------------------| | 11/22/16 11:09 | 10 23 N | 079 10 W | 987 | 59 | 55 | | | | | | 11/22/16 12:07 | 10 21 N | 079 12 W | 986 | 51 | 55 | | | | | | 11/22/16 12:51 | 10 21 N | 079 11 W | 986 | 62 | 55 | | | | | ---------------------------------------------------------------------------- C R E W R O S T E R ---------------------------------------------------------------------------- |AC | rags | |CP | simmons caulder | |Nav | grunsky | |ARWO | k8 | |LM | cumbo | |OTHER| | ---------------------------------------------------------------------------- REMARKS: VDMs: 3 drops: 6 one fast fall that I never recieved...1 questionable -drop01: for cal HSS: m // SfcWS: 17 kts SFMR: 25 kts Last center drop looked like a fast fall to me but drop assured me he got no notice on aspen. Since SLP looked good i took it. need to figure out rule on top of sonde. SFMR: -used Temp of _29_C in order to match what sonde had...chart had sloser to 28....had to readjust temp to 30 after 2nd fix bcs it was reading to high compared to sondes. DDPH: warmer then TA in storm envirnoment...not sure I would say it was bad..maybe temp probe.. always about 18 in storm...defaulted to 17.6 in order to get SLP systems: used F bcs righ tin middle although all systems close Issues/Remarks: -first leg 105nm all others 60nm by NHC -one alpha, three fixes -All good during mission but both AVI buses went down during climb! Penetrations Logged: 0 ARWO:____________________________________ Penetrations Verified: Verifier:____________________________________ Penetrations Posted: Awards:____________________________________