DEPARTMENT OF THE AIR FORCE Air Force Reserve Command MEMORANDUM FOR ARWO Scheduler 08 Jul 15 FROM: 53 WRS Flight Meteorologist SUBJECT: Mission Summary Report G E N E R A L I N F O R M A T I O N ---------------------------------------------------------------------------- | Mission Type | Tropical Depression | | Tasking | 8/18z Fix | | Mission ID | 5309 0104E CYCLONE | | Departure Base/Time | phik 07/08/15 13:15 | | Arrival Base/Time | phik 07/08/15 21:27 | | Flight Time | 8.2 hours | ---------------------------------------------------------------------------- F I X P O I N T S ---------------------------------------------------------------------------- | | Latitude | Longitude | SLP | MWnd | SWS | | | Date/Time | dd mm N/S | ddd mm E/W | mb | kt | kt | Hurricane | | 07/08/15 16:50 | 17 05 N | 143 20 W | 1002 | 41 | 40 | 07/08/15 18:16 | 17 09 N | 143 28 W | 1002 | 41 | 43 C R E W R O S T E R ---------------------------------------------------------------------------- |AC | Mentzer | |CP | Jones, Barberi | |Nav | Harris, Burton | |ARWO | Gautrau | |LM | Cumbo, Moore | |OTHER| | ---------------------------------------------------------------------------- REMARKS: Two fixes. Met the fix-time criteria on the second fix. Penetrations Logged: 0 ARWO:____________________________________ Penetrations Verified: Verifier:____________________________________ Penetrations Posted: Awards:____________________________________