DEPARTMENT OF THE AIR FORCE Air Force Reserve Command MEMORANDUM FOR ARWO Scheduler 13 Sep 13 FROM: 53 WRS Flight Meteorologist SUBJECT: Mission Summary Report G E N E R A L I N F O R M A T I O N ---------------------------------------------------------------------------- | Mission Type | Tropical Depression | | Tasking | 0210A CYCLONE | | Mission ID | 5304 0210A CYCLONE | | Departure Base/Time | KBIX 09/13/13 08:45 | | Arrival Base/Time | KBIX 09/13/13 16:15 | | Flight Time | 7.5 hours | ---------------------------------------------------------------------------- F I X P O I N T S ---------------------------------------------------------------------------- | | Latitude | Longitude | SLP | MWnd | SWS | | | Date/Time | dd mm N/S | ddd mm E/W | mb | kt | kt | Hurricane | |----------------------------------------------------------------------------| | 09/13/13 11:44 | 19 19 N | 095 06 W | 1000 | 31 | 33 | | | 09/13/13 12:40 | 19 15 N | 095 10 W | 1000 | 35 | 27 | | | 09/13/13 13:29 | 19 16 N | 095 17 W | 1000 | 37 | 37 | | ---------------------------------------------------------------------------- C R E W R O S T E R ---------------------------------------------------------------------------- |AC | Ragusa | |CP | Allen, Bell | |Nav | Tschida | |ARWO | Smith | |LM | Calloway | |OTHER| | ---------------------------------------------------------------------------- REMARKS: Keyboard locked up shortly after startup and again after second fix. Had to hard boot and append the mission each time. System C was 20 m low at 400 mb. Verified against model run and sonde. Sonde was released at 0940Z and 400 mb height was 7576m. Upgraded TD Ten to TS Ingrid. Penetrations Logged: 0 ARWO:____________________________________ Penetrations Verified: Verifier:____________________________________ Penetrations Posted: Awards:____________________________________