FY97 PROJECTS
Monitoring and Evaluation of Radar Measured Rainfall Over Florida Bay and the Everglades, F. Marks and P. Willis (OAR, RSMAS). This project was initiated in 1997.
$54K COP
$23K OAR
Simulations of Regional Climatic Patterns Which Impact the Florida Bay Water Cycle, C. Mattocks (OAR). This project was initiated in 1997.
$64K COP
A Workplan for the Continued Operation, Maintenance, and Enhancement of the SEAKEYS, J. Ogden, S. Vargo, C. Humphreys, T. Moore, and J. Hendee (FIO, KML, and OAR). This project was initiated in 1997.
$215K COP
$50K OAR
$30K NOS
The Sediment Record as a Monitor of Natural and Anthropogenic Changes in the Lower Everglades/Florida Bay Ecosystem: A High Resolution Study, T. Nelsen, P. Blackwelder, P. Swart, H. Wanless, J. Trefry, and L. Tedesco (OAR, RSMAS, FIT, and IUPUI). This was a renewal of a 1995/1996 project.
$141K COP
$69K OAR
Development of Models to Describe Ecosystem Interactions in Florida Bay, G. Jackson and A. Burd (TX A&M). This project was initiated in 1997.
$88K COP
The Role of Suspended Calcium Carbonate in the Phosphorus Cycle in Florida Bay, F. Millero and J. Zhang (RSMAS). This project was initiated in 1997.
$77K COP
Monitoring of Pesticides and Chemical Contaminants in Florida Bay, G. Scott, M. Fulton, J. Kucklick, J. Ramsdell, P. Key, E. Wirth, G. Thayer, and T. Chandler (NMFS, USC). This project was initiated in 1997.
$71K COP
$9K NMFS
The Role of Groundwater Nutrient Fluxes in the Nutrient Budget of Florida Bay, W. Burnett, J. Chanton, L. Brand, Z. Top, T. Juster (FSU, RSMAS, USF). This project was initiated in 1997.
$119COP
Circulation, Nutrient Influx, and Phytoplankton Growth in Florida Bay, G. Hitchcock and G. Vargo (RSMAS and USF). This project was an augmentation to the Lee et al. project.
$50K NOS
Pools and Fluxes of Nutrients in Florida Bay Sediments and Biological and Chemical Barriers to Flux at the Sediment Water Interface, A. Szmant, L. Brand, P. Carlson, and G. Yarbro (RSMAS and FDEP). This was a renewal of a 1995/1996 project.
$123K COP
Atmospheric Deposition of Nitrogen and Phosphorus in Florida Bay, P. Whung, T. Meyers, and S. Lindberg (OAR, ARL, ORNL). This project was initiated in 1997.
$93K COP
$35K ARL
Regional Boundary Conditions for Florida Bay, F. Aikman, B. O'Connor, and G. Mellor (NOS, Princeton). This was a renewal of a 1995/1996 project.
$91K COP
$76K NOS
Circulation and Exchange of Florida Bay and the Connecting Waters of the Gulf of Mexico and the Florida Keys, T. Lee, E. Williams, D. Wilson, E. Johns (RSMAS, OAR). This was a renewal of a 1995/1996 project.
$327K COP
$153K OAR
Field Observations to Initialize and Verify Computer Simulations of Florida Bay, N. Smith (HBOI). This project was initiated in 1997.
$59K COP
Trophic Pathways in the Pelagic Environment of Florida Bay, M. Dagg, G. Kleppel, and P, Ortner (LUMCOM, USC, and OAR). This was a renewal of a 1995/1996 project.
$122K COP
$50K OAR
Experimental Investigation of Salinity and Nutrient Effects on Florida Bay Plankton and Larval Spotted Sea Trout, E. Clarke and S. Bollens (RSMAS and SFSU). This project was initiated in 1997.
$43K COP
$20K NMFS
Fish Recruitment, Growth, and Habitat Use in Florida Bay, D. Hoss, W. Hettler, D. Peters, A. Powell, G. Thayer, M. Robblee, R. Matheson, and D. Camp (NMFS, USGS/BRD, and FDEP). This was a renewal of a 1995/1996 project.
$183K COP
$50K NMFS
Florida Bay Outreach and Community Education Program, J. Cato, and M. Clarke (Florida Sea Grant). This project was initiated in 1997.
$180K COP
Florida Bay Program Management (less data management), P. Ortner, D. Welcher, N. Thompson, and T. Lee, (OAR, NMFS, RSMAS).
$220K COP
FY97 CONTRIBUTIONS
|
COP: |
$2,270K |
|
OAR: |
$220K |
|
OAR/ERL: |
$380K |
|
NMFS: |
$79K |
|
NOS: |
$156K |
|
______ |
|
|
*Total: |
$3,105K |
|
*Pure NMFS supported projects are not included in the total |
|
INSTITUTIONAL ALLOCATION OF FY97 COP FUNDS
|
OAR/ERL (AOM:/ARL): |
$761K |
|
NMFS: |
$310K |
|
NOS: |
$76K |
|
NDBC: |
$60K |
|
RSMAS: |
$508K |
|
Other State Universities: |
$555K |
|
|
______ |
|
|
$2,270K |
APPROXIMATE SUB-ALLOCATION OF FY97 PROGRAM FUNDS
|
Salaries/Fringe Benefits: |
$1,922K |
|
Academic Inst. Overhead: |
$291K |
|
Capital Equipment: |
$183K |
|
Expendable Supplies: |
$258K |
|
Travel: |
$109K |
|
Other: |
$342K |
|
|
_______ |
|
|
$3,105K |