GSM track forecast
Fig. 3 Track forecasts for the no dropwindsonde GSM control (AVNN), the all dropwindsonde run (AVAL), the lower-level dropwindsonde run (AVP3), and the run with only targeted observations (AVTG), for Hurricane Linda, 15 September 1997 0000 UTC.