Fig. 2 Track forecasts for the no dropwindsonde GFDL
control (GFNO), the all dropwindsonde run (GFAL), the
lower-level dropwindsonde run (GFP3), the run with only targeted
observations (GFTG), and its complement (GFNT) for Hurricane
Georges, 19 September 1998 0000 UTC.
Return to Georges 1
Return to assessment page
Return to HRD main page