| FlightDirectr | Damiano |
| Pilot | Turner |
| Pilot | Kennedy |
| Navigator | Kozak |
| FlightEnginer | Bast |
| FlightEnginer | Moore |
| Radio Operatr | Sansouci |
| ElectEngineer | Roles |
| Data Technicn | Lynch |
| Lead Proj Sci | Willis | HRD |
| Radar Science | M Black | HRD |
| Radar Science | Houston | HRD |
| Cloud Physics | R Black | HRD |
| Take off | Landing | ||
| Puerto Vallarta, Mex | 1758 UTC | Puerto Vallarta, Mex | 224 UTC |
Eyewall evolution and electrification experiment into Hurricane Tina, 5 fixes.
The flight took off from Puerto Vallarta, Mex at 1758Z on 09/29/1992
and landed at Puerto Vallarta, Mex at 224Z the next day
with 5 penetrations.
Mission Data :
Flight Director log | Lead Scientist log | Radar log | Cloud Physics log | AXBT log | Dropsonde log
![]() Flight Track | ![]() Temp & Dew Point | ![]() Wind & Altitude |
| Radar | 10 | 1918 Z | 30 Z |