| Aircraft Commander |
| Co-pilot |
| Flight Director |
| Flight Director |
| Electronics Technician |
| AVAPS Operator |
| Dropsonde Operator |
| None |
![]() |
Mission Plan :
NOAA 49RF will fly an NHC-tasked Synoptic Surveillancd mission around Tropical Storm Nate. The G-IV will leave MacDill AFB, FL 1730 UTC and will recover back at MacDill AFB, FL by 0200 UTC next day.
|
Prepared by the National Hurricane Center September 07, 2011 2:16:40 PM Aircraft: N49RF Altitude: FL410-450 Proposed takeoff: 08/1730Z | |||
| DROP LOCATIONS | |||
| # | LAT | LON | TIME |
| deg min | deg min | hh:mm | |
| 1 | 25 00 | -84 15 | 0:27 |
| 2 | 23 30 | -85 00 | 0:40 |
| 3 | 21 45 | -86 00 | 0:57 |
| 4 | 22 30 | -88 00 | 1:14 |
| 5 | 24 00 | -87 00 | 1:28 |
| 6 | 25 00 | -88 00 | 1:40 |
| 7 | 24 00 | -89 00 | 1:51 |
| 8 | 25 00 | -90 30 | 2:05 |
| 9 | 23 21 | -91 08 | 2:20 |
| 10 | 22 18 | -90 18 | 2:30 |
| 11 | 19 49 | -90 44 | 2:51 |
| 12 | 19 07 | -91 23 | 2:59 |
| 13 | 18 45 | -92 29 | 3:08 |
| 14 | 18 29 | -93 46 | 3:18 |
| 15 | 18 41 | -94 52 | 3:27 |
| 16 | 19 42 | -95 42 | 3:38 |
| 17 | 21 00 | -96 00 | 3:49 |
| 18 | 22 18 | -95 42 | 3:60 |
| 19 | 23 30 | -96 30 | 4:11 |
| 20 | 25 00 | -96 30 | 4:24 |
| 21 | 25 00 | -95 00 | 4:35 |
| 22 | 23 21 | -94 52 | 4:49 |
| 23 | 23 55 | -93 40 | 4:59 |
| 24 | 23 55 | -92 20 | 5:10 |
| 25 | 25 30 | -93 00 | 5:24 |
| 26 | 26 45 | -94 00 | 5:37 |
| 27 | 26 45 | -96 00 | 5:52 |
| 28 | 28 00 | -95 00 | 6:05 |
| 29 | 28 30 | -93 30 | 6:17 |
| 30 | 28 30 | -92 00 | 6:29 |
| 31 | 26 45 | -92 00 | 6:43 |
| 32 | 26 45 | -90 30 | 6:55 |
| 33 | 28 30 | -90 30 | 7:09 |
| 34 | 28 30 | -88 45 | 7:22 |
| 35 | 26 30 | -88 45 | 7:39 |
| 36 | 26 30 | -87 00 | 7:52 |
| 37 | 27 09 | -85 00 | 8:09 |
Mission Summary :
This mission was cancelled by NHC because Nate is no longer forecast to strike the U.S.
Problems :
Page last updated September 08, 2011
Return to Mission page.