Aircraft Commander | Scott Price |
Co-pilot | Chris Kerns |
Navigator | Ryan Kidder |
Navigator | Peter Seigel |
Flight Engineer | Joe Klippel |
Flight Director | Ian Sears |
Flight Director | Jack Parrish |
Flight Director | Jess Williams |
Data Technician | Joe Bosko |
Engineer | Charles Lynch |
Engineer | Joe Greene |
Electronics Technician | Todd Richards |
Electronics Technician | Jim Warnecke |
Lead Scientist | Paul Reasor (HRD) |
Dropsonde Scientist | Kathryn Sellwood (HRD) |
Instrument Scientist | Ivan Popstefanija (ProSensing) |
Instrument Scientist | Nick Slavich (ProSensing) |
Observer | Philip Manougian (AOC) |
Observer | Jonathan Lingard (AOC) |
Proposed track |
Mission Plan :
NOAA 42RF will fly a calibration mission over the Gulf of Mexico in order to test equipment and software. The P-3 will leave MacDill AFB, FL 1400 UTC and will recover back at MacDill by 1600 UTC.
Mission Summary :
Take off | Landing
MacDill AFB, FL | 14:05 UTC
| MacDill AFB, FL | 16:20 UTC
| |
NOAA 42RF flew a calibration mission over the Gulf of Mexico to test equipment and software. The P-3 left MacDill AFB, FL 1405 UTC and recovered back at MacDill at 1620 UTC.
Problems :
Mission Data :