| Aircraft Commander | |
| Co-pilot | |
| Flight Engineer | |
| Flight Director | |
| Flight Director | |
| Dropsonde Operator | |
| Dropsonde Operator | |
| Dropsonde Operator | |
| Dropsonde Operator |
| Lead Project Scientist | Eric Uhlhorn |
| Observer | Joe Cione |
| Observer | Sylvie Lorsolo |
![]() |
Mission Plan :
The P-3 is tasked by HRD to carry out a SFMR calibration mission over the Gulf of Mexico. The aircraft will depart MacDill AFB, FL 15:00 UTC and return to MacDill AFB, FL by 18:30 UTC.
Mission Summary :
The P-3 completed an HRD-tasked SFMR calibration mission over the Gulf of Mexico. The aircraft departed MacDill AFB, FL 15:00 UTC and returned to MacDill AFB, FL at 18:45 UTC.
Problems :
![]() Flight track |
![]() Temperature and Moisture |
![]() Wind and Atlitude |