Mission Summary
20110826N1 Aircraft 49RF
Synoptic Surveillance Mission Hurricane Irene

Aircraft Crew (49RF)
Aircraft CommanderGreg Glover
Co-pilotKristie Twining
Co-pilotRon Moyers
Flight DirectorJack Parrish
Flight DirectorJess Williams
Data TechnicianMark Rogers
Dropsonde OperatorMike Mascaro
Dropsonde OperatorJoe Greene

Guests (49RF)
None


Mission Plan :

NOAA 49RF will fly an NHC-tasked Synoptic Surveillancd mission around Hurricane Irene. The G-IV will leave MacDill AFB, FL 0530 UTC and will recover back at MacDill AFB, FL by 1400 UTC that day.

HURRICANE SYNOPTIC SURVEILLANCE MISSION PLAN: Irene
Prepared by the
National Hurricane Center
August 24, 2011 6:32:03 PM
Aircraft: N49RF
Altitude: FL410-450
Proposed takeoff: 26/0530Z
DROP LOCATIONS
# LAT LON TIME
deg min deg min hh:mm
129 18-80 120:21
230 36-79 540:32
331 39-79 040:43
432 13-77 520:53
533 45-77 451:06
632 13-76 321:21
731 39-75 201:31
833 00-74 001:46
934 00-73 001:57
1035 30-75 002:17
1137 00-73 002:36
1239 00-74 002:54
1338 00-71 003:17
1436 00-69 003:39
1535 00-71 003:56
1633 00-71 004:12
1732 00-72 004:23
1831 00-73 004:34
1930 36-74 304:46
2029 18-74 124:57
2129 00-72 005:14
2227 00-72 005:30
2326 00-74 005:48
2428 00-74 306:05
2526 57-75 206:15
2626 23-76 326:26
2724 00-76 006:46
2823 00-77 006:57
2924 00-79 007:15
3026 23-77 527:36
3126 57-79 047:46
3228 00-80 007:58

Mission Summary :

Take off Landing
MacDill AFB, FL05:18 UTC MacDill AFB, FL13:16 UTC

NOAA 49RF flew an NHC-tasked Synoptic Surveillancd mission around Hurricane Irene. The G-IV left MacDill AFB, FL 0518 UTC and recovered back at MacDill AFB, FL by 1316 UTC that day. 35 dropsondes were launched and 32 of those were transmitted.

Problems :


Mission Data :


Page last updated August 30, 2011
Return to Mission page.