| Mike Black | LPS |
| Peter Dodge | Radar |
| Paul Willis | Cloud Physics |
| Krystal Valde | Radar |
The NOAA N43RF will fly a tropical cyclone genesis mission as part of IFEX in conjunction with the NASA ER-2 jet. The P3 will leave San Jose, Costa Rica at 1:00 AM EDT and will recover at San Jose, Costa Rica by 10:00 AM EDT.
Mission Summary :
The P3 left San Jose, Costa Rica at 1:00 AM EDT but returned to San Jose, Costa Rica at 9:00 AM EDt due to a failure of both the main data system and cloud physics system.
Problems :
Data :
| Start | End |
| 05:37:59 Z | 11:54:37 Z |