Mission Summary
20130912I1 Aircraft 43RF
Ferry from Tropical Storm Gabrielle missions

Aircraft Crew (43RF)
Aircraft CommanderMark Nelson
Co-pilotMark Sweeney
Co-pilotCathy Martin
NavigatorTim Gallagher
Flight Engineer Darby
Flight EngineerHeystek
Flight DirectorBarry Damiano
Radar TechnicianJoe Greene
Data TechnicianBobby Peek
Data TechnicianDana Nehar
MechanicKregelka
MechanicHirsch
Scientific Crew (43RF)
LPSPaul Chang (NESDIS)
IWRAPJoe Sapp (UMass-Amherst)
ObserverZorana Jelenak (NESDIS)

Mission Plan :

NOAA 43RF will ferry back from missions into Tropical Storm Gabrielle. The P-3 will leave St. Croix, USVI at 1930 UTC on Sept. 12th and will recover at MacDill AFB, FL by 2300 UTC on the same day.

Mission Summary :

Take off Landing
St. Croix, USVI19:41 UTC MacDill AFB, FL23:42 UTC

Problems :


Mission Data :

Flight Director's manifest | NetCDF file | FDir log


Page last updated Sept. 20, 2013
Return to Mission page.