Mission Summary
20130908N1 Aircraft 49RF
Ferry from missions into Tropical Disturbance Gabrielle

Aircraft Crew (49RF)
Aircraft CommanderJeff Hagen
Co-pilotJason Mansour
Co-pilotRon Moyers
Flight DirectorIan Sears
Flight DirectorPaul Flaherty
Radar TechnicianCharles Lynch
Lead TechGabe Defeo
Dropsonde OperatorJorge Delgado
Dropsonde OperatorLeonard Miller
MaintenanceKevin Rotteveel
Scientific Crew (49RF)
None

Mission Plan :

NOAA 49RF will ferry from St. Croix to MacDill AFB, FL after flying a mission around Tropical Disturbance Gabrielle the previous day. The G-IV will leave St.Croix, USVI by 1630 UTC on Sept. 6th and will recover at MacDill AFB, FL by 1900 UTC on the same day.

Mission Summary :

Take off Landing
St. Croix, USVI16:25 UTC MacDill AFB, FL19:14 UTC

Problems :


Mission Data :

1 sec data | NetCDF file |

Flight track

Temperature and Moisture

Wind and Atlitude


Page last updated Sept. 8, 2013
Return to Mission page.