Mission Summary
20130908H1 Aircraft 42RF
Ferry from St.Croix after operations into Tropical Disturbance Gabrielle

Aircraft Crew (42RF)
Aircraft CommanderAl Giamonte
Co-pilotJustin Kibby
Co-pilotChris Kerns
Flight EngineerJoe Klippel
Flight EngineerAl Puls (USN)
Flight DirectorRich Henning
Flight DirectorJack Parrish
Radar TechnicianDamon Sans Souci
Dropsonde OperatorJeff Smith
El TechnicianTodd Richards
MaintenanceWes Couch
Scientific Crew (42RF)
LPSJoe Cione
LPSEric Uhlhorn
HFP DirectorPaul Reasor
RadarLisa Bucci
DropsondeJun Zhang

Mission Plan :


Proposed track

Experiment Cancelled

The Genesis mission scheduled for today was cancelled. Instead NOAA 42RF will ferry back to MacDill AFB, FL. The P-3 will leave St. Croix, USVI by 1800 UTC on Sept. 8th and will recover at MacDill AFB, FL by 2300 UTC on the same day.

Mission Summary :

Take off Landing
St. Croix, USVI 18:56 UTC MacDill AFB, FL 22:37 UTC

NOAA 42RF flew a ferry flight from St. Croix, USVI to MacDill AFB, FL, leaving at 1856 UTC and arriving at 2237 UTC the same day. Data was recorded, but no drops were made.

Problems :


Mission Data :

Flight Director's manifest | FDir log | Error Summary

1 sec data | NetCDF file


Flight track

Temperature and Moisture

Wind and Atlitude


Page last updated Oct. 29, 2013
Return to Mission page.