Mission Summary
20130907H1 Aircraft 42RF
HWRF Model Evaluation into Tropical Disturbance Gabrielle

Aircraft Crew (42RF)
Aircraft CommanderAl Giamonte
Co-pilotJustin Kibbey
Co-pilotChris Kerns
Flight EngineerJoe Klippel
Flight EngineerAlan Puls (USN)
Flight DirectorRich Henning
NavigatorPete Siegel
Data TechnicianTerry Lynch
Radar TechnicianJoe Bosko
Dropsonde OperatorJeff Smith
El. TechTodd Richards

Scientific Crew (42RF)
LPSJason Dunion
RadarLisa Bucci
DropsondeJoe Cione

Mission Plan :


Proposed track

NOAA 42RF will fly an HRD-tasked HWRF Model Evaluation missions into Tropical Disturbance Gabrielle. The P-3 will leave St. Croix, USVI by 1400 UTC on Sept. 7th and will recover at St. Croix by 2300 UTC on the same day.

Mission Summary :

Take off Landing
St. Croix, USVI15:16 UTC St. Croix, USVI22:38 UTC

Problems :


Mission Data :

FDir log | Flight Director's manifest | LPS log | Radar log | Dropsonde log | AXBT log
serial data | 1 sec data | NetCDF file


Page last updated Sept. 5, 2013
Return to Mission page.