| Aircraft Commander | Jeff Hagen |
| Co-pilot | Jason Mansour |
| Co-pilot | Ron Moyers |
| Flight Director | Ian Sears |
| Flight Director | Paul Flaherty |
| Radar Technician | Charles Lynch |
| Lead Tech | Gabe Defeo |
| Dropsonde Operator | Jorge Delgado |
| Dropsonde Operator | Leonard Miller |
| Maintenance | Kevin Rotteveel |
| None |
Mission Plan :
NOAA 49RF will ferry to St. Croix for an HRD-tasked HWRF Model Evaluation mission around Tropical Disturbance Gabrielle. The G-IV will leave MacDill AFB, FL by 1400 UTC on Sept. 6th and will recover at St.Croix, USVI by 1700 UTC on the same day.
Mission Summary :
| Take off | Landing
| MacDill AFB, FL
| 15:00 UTC
| St. Croix, USVI
| 17:38 UTC
| | ||
Problems :