Aircraft Commander | Mark Nelson |
Co-pilot | Mark Sweeney |
Co-pilot | Cathy Martin |
Flight Engineer | Ken Heystek |
Flight Engineer | Paul Darby |
Flight Director | Barry Damiano |
Radar Technician | Joe Greene |
El Tech | Bobby Peek |
Data Tech | Dana Naeher |
AVAPS | Jeff Newnam |
Crew Chief | Lonnie Kregelka |
LPS | Rob Rogers (HRD) |
Radar | Jun Zhang (HRD) |
IWRAP | Joe Saap (UMass) |
IWRAP | Tom Hartley (UMass) |
Observer | Zorana Jelenak (NESDIS) |
Mission Plan :
NOAA 43RF will ferry to St. Croix for HRD-tasked Model Evaluation missions into Tropical Disturbance Gabrielle. The P-3 will leave MacDill AFB, FL at 1400 UTC on Sept. 6th and will recover at St. Croix by 1900 UTC on the same day.
Mission Summary :
Take off | Landing
MacDill AFB, FL
| 15:52 UTC
| St. Croix, USVI
| 20:01 UTC
| |
Problems :
Flight track |
Temperature and Moisture |
Wind and Atlitude |