| Aircraft Commander | Mark Nelson |
| Co-pilot | Mark Sweeney |
| Co-pilot | Cathy Martin |
| Flight Engineer | Ken Heystek |
| Flight Engineer | Paul Darby |
| Flight Director | Barry Damiano |
| Radar Technician | Joe Greene |
| El Tech | Bobby Peek |
| Data Tech | Dana Naeher |
| AVAPS | Jeff Newnam |
| Crew Chief | Lonnie Kregelka |
| LPS | Rob Rogers (HRD) |
| Radar | Jun Zhang (HRD) |
| IWRAP | Joe Saap (UMass) |
| IWRAP | Tom Hartley (UMass) |
| Observer | Zorana Jelenak (NESDIS) |
Mission Plan :
NOAA 43RF will ferry to St. Croix for HRD-tasked Model Evaluation missions into Tropical Disturbance Gabrielle. The P-3 will leave MacDill AFB, FL at 1400 UTC on Sept. 6th and will recover at St. Croix by 1900 UTC on the same day.
Mission Summary :
| Take off | Landing
| MacDill AFB, FL
| 15:52 UTC
| St. Croix, USVI
| 20:01 UTC
| | ||
Problems :
![]() Flight track |
![]() Temperature and Moisture |
![]() Wind and Atlitude |