Mission Summary
20130906H1 Aircraft 42RF
Ferry to St.Croix for operations into Tropical Disturbance Gabrielle

Aircraft Crew (42RF)
Aircraft Commander
Co-pilot
Co-pilot
Flight Director
Flight Director
Radar Technician
Dropsonde Operator
Dropsonde Operator
Dropsonde Operator
Maintenance
Scientific Crew (42RF)
LPSEric Uhlhorn
AXBTJoe Cione
RadarPaul Reasor
DropsondeLisa Bucci

Mission Plan :


Proposed track

NOAA 42RF will ferry to St. Croix for HRD-tasked Model Evaluation missions into Tropical Disturbance Gabrielle. Along the way they will pass through the center of Gabrielle and deploy AXBTs to measure the ocean's response to the storm. The P-3 will leave St. Croix, USVI by 1400 UTC on Sept. 6th and will recover at St. Croix by 2022 UTC on the same day.

Mission Summary :

Take off Landing
MacDill AFB, FL 14:00 UTC St. Croix, USVI 20:22 UTC

Problems :


Mission Data :

LPS log | AXBT log | FDir log | serial data


Page last updated Sept. 5, 2013
Return to Mission page.