Mission Summary
20130901N1 Aircraft 49RF
Ferry back from missions into Tropical Disturbance AL97

Aircraft Crew (49RF)
Aircraft CommanderKristie Twining
Co-pilotNick Toth
Co-pilotRon Moyers
Flight DirectorIan Sears
Flight DirectorPaul Flaherty
Radar TechnicianJoe Greene
Dropsonde OperatorDale Carpenter
Dropsonde OperatorJohn Hill
Dropsonde OperatorJeff Smith
MaintenanceAngel Negron
Scientific Crew (49RF)
None

Mission Plan :

NOAA 49RF will ferry back from St. Croix after an HRD-tasked Genesis mission around Tropical Disturbance AL97. The G-IV will leave St. Croix, USVI by 1100 UTC on Sept. 1st and will recover at MacDill AFB, at 1400 UTC on the same day.

Mission Summary :

Take off Landing
St. Croix, USVI15:32 UTC MacDill AFB, FL18:13 UTC

Problems :


Mission Data :

FDir log | Flight Director's manifest | 1 sec data | NetCDF file |


Page last updated Sept. 3, 2013
Return to Mission page.