| Aircraft Commander |
| Co-pilot |
| Navigator |
| Navigator |
| Flight Engineer |
| Flight Director |
| Flight Director |
| Flight Director |
| Data Technician |
| Engineer |
| Engineer |
| Electronics Technician |
| Electronics Technician |
| Lead Scientist | John Gamache (HRD) |
| Dropsonde Scientist | Kathryn Sellwood (HRD) |
![]() Proposed track |
Mission Plan :
NOAA 42RF will fly a combination TDR and test mission into Tropical Storm Ernesto to gather tail doppler data and to test equipment and software. The P-3 will leave MacDill AFB, FL 1600 UTC and will recover back at MacDill by 0000 UTC the next day.
Mission Summary :
Flight was cancelled
Problems :
Mission Data :
|