Aircraft Commander |
Co-pilot |
Navigator |
Navigator |
Flight Engineer |
Flight Director |
Flight Director |
Flight Director |
Data Technician |
Engineer |
Engineer |
Electronics Technician |
Electronics Technician |
Lead Scientist | John Gamache (HRD) |
Dropsonde Scientist | Kathryn Sellwood (HRD) |
Proposed track |
Mission Plan :
NOAA 42RF will fly a combination TDR and test mission into Tropical Storm Ernesto to gather tail doppler data and to test equipment and software. The P-3 will leave MacDill AFB, FL 1600 UTC and will recover back at MacDill by 0000 UTC the next day.
Mission Summary :
Flight was cancelled
Problems :
Mission Data :
|