| Aircraft Commander |
| Co-pilot |
| Flight Director |
| Flight Director |
| Electronics Technician |
| AVAPS Operator |
| Dropsonde Operator |
| None |
|
|
Mission Plan :
NOAA 49RF will fly ferry to Barbados of a series of missions around Tropical Storm Earl east of Barbados. The G-IV will leave MacDill AFB, FL at 1100 UTC and will recover at Barbados by 1500 UTC then quickly turn around for a Synoptic Surveillance mission.
Mission Summary :
NOAA 49RF ferried to Barbados for a series of missions around Tropical Storm Earl east of Barbados. The G-IV left MacDill AFB, FL at 1115 UTC and recovered at Barbados by 1503 UTC then quickly turned around for a Synoptic Surveillance mission in less than two hours.
Problems :